Main | September 2003 »

December 2002 Archives

December 11, 2002

MicroStar: Ocean Planet Installation

The Made in America Foundation Globe Challenge "Open 60" - Ocean Planet -- completed construction at Schooner Creek Boat Works in Portland, OR. USA on April 5, 2002. The unique design of Ocean Planet brings a new, innovative approach to the Open 60 class of boats.

We at Berkeley Point were excited for the opportunity to see the MicroStar (Model 100)in action. The below photographs give a good representation of a Marine installation. (Click images to enlarge.)


Ocean Planet leaving Pacific Sail Expo Dock.

Bruce Schwab - Below Decks.

Nav Station - Clustered MicroStar chart light.

Sail Locker - duplex MicroStar fixture above.

Duplex MicroStar fixture above, forward of carbon fiber ring frame.

Duplex MicroStar fixtures, port and starboard (in picture) of mast (looking aft) .

Duplex MicroStar fixtures, port and starboard of mast (looking forward).

Duplex MicroStar fixture above stowed pipe berth.

Duplex MicroStar fixture on main bulkhead, starboard side, in vestibule .

About December 2002

This page contains all entries posted to BerkeleyPoint Applications in December 2002. They are listed from oldest to newest.

September 2003 is the next archive.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.32